Amendment History · Victoria

Port Phillip: every recorded scheme amendment.

7 amendments specific to this scheme, plus 8 state-wide. Most recent: C218port, gazetted 13/08/2026. As at 2026-08-29.

This is a chronology, not an analysis. Feasibly checks the Victorian amendment register daily and records when the Port Phillip scheme version changes — which amendment, and on what date. It does not record what an amendment contained; for that, read the amendment itself.

Port Phillip-specific amendments (7)

AmendmentReplacedGazettedDetected by Feasibly
C218port C234port 13/08/2026 2026-08-12
C234port C231port 27/07/2026 2026-07-26
C231port VC312 25/06/2026 2026-06-24
SV259 VC309 25/05/2026 2026-05-26
SV259 VC309 25/05/2026 2026-05-25
SV205 VC232 01/05/2026 2026-05-01
C233port VC304 09/04/2026 2026-04-08

“Gazetted” is the date the Victorian government publishes; “detected” is the date our monitor saw the register change. Some detections precede the gazettal date because the amendment register publishes ahead of the Gazette — a publishing quirk of the register, not advance notice.

State-wide amendments that also applied (8)

These were not made by Port Phillip. A state-wide amendment changes the Victoria Planning Provisions and therefore every Victorian planning scheme at once, including this one.

AmendmentReplacedGazettedScope
GC296 C218port 18/08/2026 Multiple schemes
VC312 VC311 16/06/2026 All Victorian schemes
VC311 SV259 09/06/2026 All Victorian schemes
VC309 VC248 12/05/2026 All Victorian schemes
VC248 SV205 05/05/2026 All Victorian schemes
VC307 VC308 20/04/2026 All Victorian schemes
VC308 VC300 17/04/2026 All Victorian schemes
VC300 C233port 16/04/2026 All Victorian schemes

What this page does and does not tell you

It does tell you that the Port Phillip scheme changed, which amendment did it, and when — enough to know whether advice given on this scheme predates a change. It does not tell you what changed. Coverage begins when our monitoring of this scheme began, so an empty earlier period means we were not watching, not that nothing happened. The current control values are on the reference page linked below.

This information is provided for research and preliminary screening only. It does not constitute professional planning, legal or architectural advice. Always verify with Port Phillip before making decisions.

Port Phillip amendments — common questions

How many amendments has the Port Phillip Planning Scheme had?

Feasibly has recorded 7 amendments specific to the Port Phillip Planning Scheme, the most recent being C218port on 13/08/2026. A further 8 state-wide amendments applied to this scheme along with every other Victorian planning scheme over the same period. As at 2026-08-29.

What is the latest Port Phillip planning scheme amendment?

C218port, gazetted 13/08/2026. It replaced version C234port. Feasibly records that the scheme changed and when; it does not record what the amendment contained — read the amendment itself for that.

Does Feasibly say what each amendment changed?

No. The monitor detects that the Port Phillip scheme version changed, and on what date. Describing what an amendment contained would be guessing, so this page lists the change and its date only. For the substance, read the amendment on the Victorian planning scheme amendment register.

How often does the Port Phillip Planning Scheme change?

Across the recorded period, Port Phillip averaged one council-specific amendment roughly every 52 weeks by count alone. Amendments do not arrive evenly, so treat this as cadence rather than a schedule.

Check a specific address in Port Phillip

Amendment history tells you the scheme moved. To see the zone, overlays and controls that apply to one parcel today, screen an address — free, no signup.

Screen an address →